November 2012
Important notes: With the meter renumbering project complete, there appears to be a significant improvement with the number of rejected meter numbers made to the Call Center. Prior to this effort, a monthly rejection rate of 18-20% was common. Current rejection rates have been reduced to approximately 8% rejected. Review the top meter rejection list to ensure numbers are accurately labeled on meter equipment.
Performance Report Results:
LATE: Dashboard, Summary, Detail
Multi Space Operability: Dashboard, Summary, Detail,
Single Space Operability: Dashboard, Summary, Detail
Other Report Results:
Most frequently reported Meters Reported for Repairs
Top Repairs Made
Top Rejections due to invalid meter number
Excellent information provided you. Thanks for the sharing with us.......Equipment Performance Monitoring Systems
ReplyDelete